Railing work started, more work on the cabinets including crown moulding installed, baseboard installed on most rooms, window and door casing done. Garage doors installed (may have been last week, but whatever!)
Cabinets/countertops delivered. Most cabinets/countertops installed. Window and door trim worked on. All doors installed by the end of the week. Most window and door casings in place, too. Basement walls done - tape, texture, white paint. Stairs in garage into house done.
Feb 7-11, 2011
Electricians were back - installed the outlets and light switches, recessed lights and the chandelier. Tape and texture work started on the basement. Cabinets delivered. More work on the siding. Doors delivered. Some doors installed.
Pretty much the entire house was painted by Brady, Jill, Mom, and Dad. The tall foyer and staircase walls were painted by the hired guy who was much faster than we were but the same quality :) Thanks for all the painting help, mom and dad. Drew's basketball court isn't painted on the walls of his new room yet, but other than that, the main floor and upstairs painting is DONE.