Monday January 17 - Friday January 21, 2011
Only indoor work since the temperature has been about 10 below on average.  The drywall guy has been taping and mudding all week.  They took a piece or 2 of sheetrock off the wall in the stairwell so that when they deliver the sheetrock for the basement, they can just deliver it right into the basement and not have to turn the corner in the stairwell while hauling 8-12 ft sheets of sheetrock.  Brady pulled coaxial cable in the basement family room.  Sheetrock is delivered for basement walls and ceiling.  No pictures - the house looks about the same as the last post!